ROCK Architecture Studio believes in transparency

We want to be as transparent with fees as possible, however every project is different and so the fee will reflect that. 


There is not one size fits all. Having worked in much larger practices, we know what they charge. As a small practice with fewer overheads, we wish to pass on this benefit to you. We aim to provide fixed fees in line with the RIBA stages for as much work as possible giving clients cost certainty at every stage. For work that can vary a lot, such as work on site, we would look to work at an hourly rate of £60/hr.


Architects in the UK typically charge between 3% and 15% of the total construction cost.

Sample Fees

Stage 0-1: Initial Consultation – Free

Stage 2: Feasibility - £1,500-2,500 

Stage 3: Planning - £2,000-3,000

Stage 4: Building Regulation - £3,000-4,000

Stage 5: Construction/Tender Drawings - £2,000-3,000

Stage 6: On Site – 10-20hours a month for 3months - £1,800-£3,600

Stage 7: In Use – Defects inspection and report 5hours - £300


CDM - Principal Designer - £450


Total: £11,050-£16,850 (4-7% of build cost)


Stage 0-1: Initial Consultation – Free

Stage 2: Feasibility - £2,000-3,000

Stage 3: Planning - £4,000-7,000

Stage 4: Building Regulation - £5,000-8,000

Stage 5: Construction/Tender Drawings - £4,000-7,000

Stage 6: On Site – 15-30hours a month for 12months - £10,800-£21,600

Stage 7: In Use – Defects inspection and report 7hours - £420


CDM - Principal Designer - £1200


Total £27,420 – £48,220 (3.7% - 6.4% of build cost)


  • Topographical and Measured Building Survey (approx.. £500-£2000 depending on scope)
  • Planning Application/Pre-App Fee (Householder £528+Admin fee, New House £588+ Admin fee)
  • Building Control Fee (£1000-2000 depending on size)
  • Ecology Survey (£300-500 for a phase 1 survey but further surveys could be required increasing cost significantly)
  • Asbestos Survey (£1000-2000 depending on size)
  • Arboricultural Survey (£1000-2000 depending on size)
  • Archeoligical Survey (£1000-2000 depending on size but further surveys or a watching brief could be required which will significantly increase costs)
  • Structural Engineer
  • Quantity Surveyor


Copyright © 2025 ROCK Architecture Studio - All Rights Reserved.

  • Privacy Policy

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept